確保建筑工程圍擋安裝得當(dāng)需遵守相關(guān)事項(xiàng)
來(lái)源:http://gdinte.com.cn/ 發(fā)布時(shí)間:2022-06-11
建筑工程圍擋的布置安裝是工程項(xiàng)目的重中之重,根據(jù)施工地點(diǎn),條件不同而不同。那么為保證建筑工程圍護(hù)結(jié)構(gòu)的正確安裝,還需要遵守相關(guān)的安裝事項(xiàng),具體如下:
The layout and installation of building engineering enclosure is the top priority of the project, which varies according to the construction site and conditions. In order to ensure the correct installation of building envelope, relevant installation matters shall be observed, as follows:
1、設(shè)備布置應(yīng)根據(jù)項(xiàng)目發(fā)展情況確定,必須在本項(xiàng)目開(kāi)工前實(shí)現(xiàn)。不允許過(guò)早調(diào)度和提前阻塞道路上的一半交通。墻面布置應(yīng)整齊穩(wěn)定。布置位置應(yīng)以不妨礙道路交通和行人的條件為基礎(chǔ)。除了收支入口外,還要繼續(xù)封鎖,確保工地遠(yuǎn)離外界。封閉前應(yīng)做好交通引導(dǎo)標(biāo)志,并指定專(zhuān)人負(fù)責(zé)施工期間的交通秩序。在固定區(qū)域附近,嚴(yán)禁堆放殘土、建筑材料等雜物,確保區(qū)域清潔。
1. The equipment layout shall be determined according to the development of the project and must be realized before the commencement of the project. It is not allowed to dispatch and block half of the traffic on the road in advance. The wall layout shall be neat and stable. The layout shall be based on conditions that do not impede road traffic and pedestrians. In addition to the revenue and expenditure entrance, it is necessary to continue to block the construction site to ensure that it is far away from the outside world. Traffic guidance signs shall be made before closure, and special personnel shall be appointed to take charge of the traffic order during construction. It is strictly prohibited to stack debris such as residual soil and building materials near the fixed area to ensure that the area is clean.
2、固定區(qū)域的大小要求現(xiàn)場(chǎng)布置圍護(hù)結(jié)構(gòu)后,能有效避免灰塵和音樂(lè)的傳播,施工現(xiàn)場(chǎng)的防護(hù)難度逐漸增加。郊區(qū)相關(guān)部分不小于2.5m,其余部分不小于1.8m。施工厚度不得小于0.45mm。在1.5米高的十字路口沿行人和車(chē)輛的視線(xiàn)行駛。這使行人和駕駛員更容易看到路況并提高施工性。使用塑料密封蓋,增加了填充后的圍擋的風(fēng)穩(wěn)定性,無(wú)需在空氣中打孔。
2. The size of the fixed area requires that after the enclosure structure is arranged on site, the transmission of dust and music can be effectively avoided, and the difficulty of safety protection on the construction site gradually increases. The relevant parts in the suburbs shall not be less than 2.5m, and the rest shall not be less than 1.8m. The construction thickness shall not be less than 0.45mm. Drive along the line of sight of pedestrians and vehicles at the 1.5m high intersection. This makes it easier for pedestrians and drivers to see the road conditions and improves construction safety. The use of plastic sealing cover increases the wind stability of the filled enclosure without punching in the air.
3.圍擋廠(chǎng)家認(rèn)為需要正常的保護(hù)和控制圍擋,連接到不完整的圍擋。干凈,丑陋,完好無(wú)損。施工完成后,應(yīng)立即清理施工現(xiàn)場(chǎng),、野蠻地抽取,并遵守野蠻的施工規(guī)范。使用一段時(shí)間后,會(huì)有一些磨損跡象。這一次,圍護(hù)結(jié)構(gòu)不能充分發(fā)揮圍護(hù)結(jié)構(gòu)在城市抗風(fēng)等問(wèn)題上的作用。這種施工圍護(hù)結(jié)構(gòu)需要早期反復(fù)保護(hù)和維護(hù),其功能無(wú)法保證。
3. the enclosure manufacturer thinks that normal protection and control enclosure is required and connected to incomplete enclosure. Clean, ugly, intact. After the construction is completed, the construction site shall be cleaned immediately, the samples shall be extracted safely and savagely, and the savage construction specifications shall be observed. After a period of use, there will be some signs of wear. This time, the enclosure structure can not give full play to its role in urban wind resistance and other issues. This kind of construction envelope needs early repeated protection and maintenance, and its safety function cannot be guaranteed.
此外建筑工程必須全封閉,市區(qū)主要道路或人流大的不得低于2.5米,其余不得低于1.8米,一般半封閉多見(jiàn)于市政工程,所謂的半封閉指兩面或三面設(shè)立圍擋,一面或兩面開(kāi)放,便于施工機(jī)具材料的進(jìn)出。具體要怎么設(shè)置根據(jù)招標(biāo)文件、圖紙、現(xiàn)場(chǎng)環(huán)境,施工組織設(shè)計(jì)在保證的情況下來(lái)確定。
In addition, the construction works must be completely closed. The main roads in the urban area or with a large flow of people shall not be less than 2.5 meters, and the rest shall not be less than 1.8 meters. Generally, semi closed is most common in municipal works. The so-called semi closed refers to two or three fences, and one or both sides are open to facilitate the access of construction equipment and materials. The specific setting shall be determined according to the bidding documents, drawings, site environment and construction organization design under the condition of ensuring safety.
以上就是今天所要講解的內(nèi)容了,相信大家在看完本文的描述之后,能夠?qū)υ摦a(chǎn)品有一定的認(rèn)識(shí)和了解,希望以上內(nèi)容能幫助到你。另外,若你想要了解更多相關(guān)資訊,可以多多關(guān)注我們的網(wǎng)站動(dòng)態(tài)gdinte.com.cn。
The above is the content to be explained today. I believe that after reading the description of this article, you can have a certain understanding of the product. I hope the above content can help you. In addition, if you want to learn more about our website, you can pay more attention to our website at www.jnpfjc com。